Location: Gera , Germany The scope of the task included disassembly and preparation for relocation of a combined heat and power plant with an electric power of 78 MW and a thermal power of 140 MW. The disassembly included the disassembly of all equipment and structure, including two SIEMENS SGT – 600 gas turbines, two
-
Location: Wädenswil, Switzerland Dismantling of the fruit extract production plant FRUTAROM SCHWEIZ AG and preparation for relocation
-
Dismantling and preparation for relocation of a complete installation.
-
Location: Bietigheim – Bissingen, Germany The task was to dismantle and transport to Poland the PVC softening installation and dust extraction systems